C&EE X 407.3 - Construction Scheduling with Primavera® (P6)
Course Description
This course presents an in-depth study of the current systems and techniques applied in construction planning, scheduling, control and delay impact analysis. Instruction emphasizes the Critical Path Method approach to developing baseline schedules, progress measurement, earned value, integrated management systems and as-planned versus as-built analysis. The course also includes hands-on computerized scheduling using Primavera Systems software.
Course Outline
An in-depth study of the current systems and techniques applied in construction planning, scheduling, control, and delay impact analysis.
Notes
Contact:Department of Engineering & Technology
(310) 825-4100
et@uclaextension.edu
Applies Towards the Following Certificates
- Construction Management : Required Courses
- Construction Management Extended : Required Courses
- Study Abroad at UCLA Program : Required